Summary for Test 2024-05-20-146-4
Test performed: AASHTO T51-22Project Information
Project Identifiers | Project ID: 214135 DEA: 09213404 EFIS: 0900000030 |
---|---|
DIST-CO-RTE-PM | 09-INY-395-29.9/41.8 |
Award Date | 10/22/2021 |
Closeout Date | Not set |
Work Description | ROADWAY EXCAVATION, PLACE HMA (TYPE A), AND ALTERNATIVE PIPE CULVERT. |
Location Description | INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE |
QA Service Level | 1 (Verified on 05/03/2019) |
Sample Information
Sample Taken Date | 05/20/2024 | Sample Unique Key | 146 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/12/2024 |
Sample type | Acceptance | A brief description of the sample | Asphalt Binder Sample |
The quantity of what the sample constitutes | 1 Can | From where was the sample collected | Source |
First name of sampler or witnessed by | J. | Last name of sampler or witnessed by | Kupeula |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | San Juaquin Refining Co. | Transportation Laboratory (TL) Number | C729367 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 70-10 |
---|---|---|---|
Modified | No | Lot number | |
Sublot number | Tank number | ||
Time of sample | HMA Supplier | ||
Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2024-05-20-146
DIME Test ID: 2024-05-20-146-4
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T51-22: Standard Method of Test for Ductility of Asphalt Materials (Asphalt Binder)
Test Release Date: 2024-06-19
Test Results
Is a normal test obtainable?: Yes
Number of replicates tested: One
Input Type: Measured
Tester's full name: Raul Cardenas
Date of test: 06/17/2024
Ductility of test #1 (D1): 150 cm
Ductility of sample: 150 cm
General comments (publicly viewable) (Max 1000 characters): DUCT
Test was verified on 6/19/2024 ✔