Summary for Test 2024-05-21-36-9

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 1000036
DEA: 120U2304
EFIS: 1223000056
DIST-CO-RTE-PM12-ORA-241-14.6/33.7
Award Date03/06/2024
Closeout Date11/07/2024
Work DescriptionCOLD PLANE AC PAVEMENT, PLACE RHMA AND HMA.
Location DescriptionORANGE COUNTY AT VARIOUS LOCATIONS FROM OSO PARKWAY OVERCROSSING TO SANTIAGO CREEK
QA Service Level1 (Verified on 01/26/2024)

Sample Information

Sample Taken Date05/21/2024 Sample Unique Key36
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/22/2024
Sample typeVerification A brief description of the sampleJMF 1/2" WMA-A-SP R15 0.4% EVO P25
The quantity of what the sample constitutes4 Bags of Comb. Agg, 2 Bags Rap From where was the sample collectedManufacturer
First name of sampler or witnessed byVicttor Last name of sampler or witnessed byCapacete
Title of sampler Telephone number of sampler
Laboratory sample identification0257A-24 Linked DIME Sample ID
The fabricator/manufacturer/facility nameAll American Asphalt- Corona Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-33-0005
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedBelt Cut at All American Corona Plant
Where the material sample would have been placed if not sampledAsphalt Paving Primary Aggregate Nominal Size1/2 inch
The concrete mix design number102775 Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2024-05-21-36
DIME Test ID: 2024-05-21-36-9
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2024-06-27

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: Yes
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Seige Mendoza
Date of test: 05/30/2024
Sieve SizeCumulative Percent Passing
100 %
100 %
100 %
100 %
100 %
100 %
99 %
92 %
68 %
48 %
36 %
27 %
19 %
14 %
10 %
General comments (publicly viewable) (Max 1000 characters): Rap Gradation After Ignition

Test was verified on 6/27/2024