Summary for Test 2023-06-29-17-7
Test performed: ASTM C1611-21Project Information
| Project Identifiers | Project ID: 993446 DEA: 120J34U4 EFIS: 1218000034 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-55,55-29.6,R6.4/10.3 |
| Award Date | 05/27/2022 |
| Closeout Date | Not set |
| Work Description | CONSTR BRIDGES, RW, SW, JPCP, HMA PVMT, DRAINAGE AND ELECT SYSTEMS. |
| Location Description | ORANGE COUNTY IN IRVINE, SANTA ANA, AND TUSTIN ON ROUTE 5 AT NEWPORT AVENUE UNDERCROSSING AND ON ROUTE 55 FROM 0.4 MILE NORTH OF ROUTE 55/405 SEPARATION TO 0.1 MILE SOUTH OF ROUTE 5/55 SEPARATION |
| QA Service Level | 1 (Verified on 06/24/2022) |
Sample Information
| Sample Taken Date | 06/29/2023 | Sample Unique Key | 17 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/30/2023 |
| Sample type | Quality Control | A brief description of the sample | PCC 4'' X 8'' Test Cylinder |
| The quantity of what the sample constitutes | Two Girders | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Roberto | Last name of sampler or witnessed by | Reyes |
| Title of sampler | QC Technician | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Con-Fab California, LLC | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | SCC-S85-0FG |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 3617 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Back of truck chute | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-06-29-17
DIME Test ID: 2023-06-29-17-7
Testing Lab: Con-Fab California, LLC
Test Method: ASTM C1611-21: Standard Test Method for Slump Flow of Self-Consolidating Concrete
Test Release Date: 2024-06-10
Test Results
What unit system is used for measurements?: inches
Input Type: Calculated
Tester's full name: Roberto Reyes
Date of test: 06/29/2023
Filling the mold procedure: Filling Procedure B (Inverted Mold)
Diameter 1: 26.5 in
Diameter 2: 27 in
Visual Stability Index: 1
Slump Flow: 27 in
General comments (publicly viewable) (Max 1000 characters): Reported as 26.75"
Test was verified on 6/10/2024 ✔