Summary for Test 2024-06-04-34-3

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 994673
DEA: 033F0704
EFIS: 0312000054
DIST-CO-RTE-PM03-SAC-51-2.0/3.5
Award Date08/17/2023
Closeout DateNot set
Work DescriptionAmerican River Bridge Rehabilitation
Location DescriptionNot set
QA Service Level1 (Verified on 05/15/2023)

Sample Information

Sample Taken Date06/04/2024 Sample Unique Key34
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/04/2024
Sample typeQuality Assurance A brief description of the samplePortable Skid Testing
The quantity of what the sample constitutesSkid Testing From where was the sample collectedJob Site
First name of sampler or witnessed byJessie Last name of sampler or witnessed byWilson
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameAT THE JOB SITE Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameAmerican River Bridge Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedBehind K-Rail/Barrier DIST-CO-RTE03-Sac-51
Direction of TravelNorth Post Mile2.61
Lanes to be Tested Station

Test Details

DIME Sample ID: 2024-06-04-34
DIME Test ID: 2024-06-04-34-3
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2024-06-05

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Jessie Wilson
Date of test: 06/04/2024
Air Temperature: 70 F
Tire Pressure: 25 psi
Equipment PST #: 1009
Is Calibration within ± values: Yes
Weather: Sunny
Direction/Lane #: NB: Northbound Direction of Travel
Edge used to measure reference distance: Beginning of Bridge
Edge used to measure position: Left of Right Construction Edge
Reference Distance 1: 1053 ft
Reference Distance 2: 1056 ft
Reference Distance 3: 1059 ft
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 2 ft
Position for Stationing 2: 2 ft
Position for Stationing 3: 2 ft
Percent Grade for 1st Stationing: -1.0 %
Percent Grade for 2nd Stationing: -1.0 %
Percent Grade for 3rd Stationing: 0.0 %
Corrected Coefficients of Friction for Stationing 1: 0.25
Corrected Coefficients of Friction for Stationing 2: 0.28
Corrected Coefficients of Friction for Stationing 3: 0.28
Average Coefficient of Friction: 0.27
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/5/2024