Summary for Test 2024-05-10-42-7

Test performed: AASHTO T301-22

Project Information

Project IdentifiersProject ID: 995031
DEA: 023H82U4
EFIS: 0223000011
DIST-CO-RTE-PM02-LAS-44-0.0/37.2
Award Date10/24/2023
Closeout Date07/03/2025
Work DescriptionREPLACE AC SURFACING, PLACE RHMA, HMA, THERMOPLASTIC TRAFFIC STRIPE.
Location DescriptionLASSEN COUNTY ABOUT 9 MILES EAST OF OLD STATION FROM SHASTA COUNTY LINE TO ROUTE 36
QA Service Level1 (Verified on 08/10/2023)

Sample Information

Sample Taken Date05/10/2024 Sample Unique Key42
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/23/2024
Sample typeVerification A brief description of the samplePG 58-34 M 3/4 HMA W/22% RAP
The quantity of what the sample constitutes2 cans-JMF From where was the sample collectedFabricator
First name of sampler or witnessed byBW Last name of sampler or witnessed byUnknown
Title of samplerTET Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameHat Creek - Ward Lake Transportation Laboratory (TL) NumberD79524
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 58-34 M
ModifiedYes Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierAlbina Asphalt (Klamath Falls Plant) - Klamath Falls OR MultigradeNo
Multigrade Type Asphalt Binder Mix Number

Test Details

DIME Sample ID: 2024-05-10-42
DIME Test ID: 2024-05-10-42-7
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T301-22: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Test Release Date: 2024-06-03

Test Results


Input Type: Measured
Tester's full name: Raul Cardenas
Date of test: 06/03/2024
Final Reading from the testing machine (X): 17.0 cm
% Elongation Recovery: 15 %
General comments (publicly viewable) (Max 1000 characters): ER

Test was verified on 6/3/2024