Summary for Test 2024-05-17-59-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 994897 DEA: 081G8804 EFIS: 0816000098 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-15-6.7/R22.3 |
| Award Date | 08/11/2023 |
| Closeout Date | 06/03/2025 |
| Work Description | ROCK BLANKET, STAMPED CONCRETE, MGS AND VEGETATION CONTROL. |
| Location Description | SAN BERNARDINO COUNTY IN AND NEAR FONTANA AND RANCHO CUCAMONGA FROM BASELINE AVENUE UNDERCROSSING TO 0.9 MILE NORTH OF ROUTE 15/138 SEPARATION |
| QA Service Level | 1 (Verified on 08/15/2023) |
Sample Information
| Sample Taken Date | 05/17/2024 | Sample Unique Key | 59 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 05/17/2024 | Sample type | Acceptance |
| A brief description of the sample | Subgrade | The quantity of what the sample constitutes | 16.3 kg |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Mohammed |
| Last name of sampler or witnessed by | Haque | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | I-15 NB South of Glen Helen Pkwy | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2024-05-17-59
DIME Test ID: 2024-05-17-59-1
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-05-30
Test Results
Method Type:: Standard Count
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Mohammed Haque
Date of test: 05/17/2024
Sum of Count or Density: 6501 g/cc
Average of Count or Density: 1300 g/cc
Sum of Moisture Count: 507 g/cc
Average of Moisture Count: 101 g/cc
Count Ratio Density: 0.74
Count Ratio Moisture: 0.16
Calculated Percent Relative Compaction: 97.7 %
Reported Percent Relative Compaction: 98 %
General comments (publicly viewable) (Max 1000 characters): Density Spec 90%
Test was verified on 5/30/2024 ✔
