Summary for Test 2024-05-29-8-2
Test performed: CTM 216-June 2011Project Information
Project Identifiers | Project ID: 209820 DEA: 04297634 EFIS: 0415000040 COOP: 042548 |
---|---|
DIST-CO-RTE-PM | 04-ALA-84,680-17.9/21 |
Award Date | 02/19/2021 |
Closeout Date | Not set |
Work Description | ROUTE 84 WIDENING (4-LANE EXPRESSWAY) FROM I-680 TO PIGEON PASS, INCLUDING INTERSECTION, DRAINAGE IMPROVEMENTS AND UTILITY RELOCATION. |
Location Description | ALAMEDA COUNTY IN AND NEAR SUNOL, PLEASANTON, AND LIVERMORE ON ROUTE 84 FROM 0.1 MILE EAST OF ROUTE 680 TO 0.1 MILE SOUTH OF RUBY HILL DRIVE AND ON ROUTE 680 FROM 1.2 MILES SOUTH TO 1.8 MILES NORTH OF ROUTE 84 |
QA Service Level | 1 (Verified on 11/04/2019) |
Sample Information
Sample Taken Date | 05/29/2024 | Sample Unique Key | 8 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/29/2024 |
Sample type | Quality Assurance | A brief description of the sample | Structural Backfill- Martin Marietta Sunol |
The quantity of what the sample constitutes | 2500g | From where was the sample collected | Job Site |
First name of sampler or witnessed by | charles | Last name of sampler or witnessed by | poolis |
Title of sampler | Caltrans TET | Telephone number of sampler | |
Laboratory sample identification | SJ-052924-SBF1 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Martin Marietta Sunol | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Martin Marietta Sunol Plant |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Sta.580+90 to Sta.577+90 | |
Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2024-05-29-8
DIME Test ID: 2024-05-29-8-2
Testing Lab: CT D04 - San Jose Construction Field Laboratory
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2024-06-06
Test Results
Is oversize material: No
Input Type: Calculated
Tester's full name: Charles Poolis
Date of test: 05/29/2024
In-place wet density: 2.2
Highest adjust wet density: 2.32
% Moisture: no data
Optimum Moisture: no data
Relative compaction: 95
General comments (publicly viewable) (Max 1000 characters): Sta. 580+90 to Sta. 577+90
Test was verified on 6/6/2024 ✔