Summary for Test 2024-03-15-53-3
Test performed: CTM 557-June 2020Project Information
| Project Identifiers | Project ID: 215425 DEA: 06360244 EFIS: 0613000005 |
|---|---|
| DIST-CO-RTE-PM | 06-TUL-99-30.6/35.2 |
| Award Date | 04/23/2021 |
| Closeout Date | Not set |
| Work Description | Widen Freeway & Bridge Construction (Concrete Bridge) |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 11/01/2021) |
Sample Information
| Sample Taken Date | 03/15/2024 | Sample Unique Key | 53 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/16/2024 |
| Sample type | Quality Control | A brief description of the sample | 4x8 Concrete Cylinders |
| The quantity of what the sample constitutes | 5 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Brian | Last name of sampler or witnessed by | Lovett |
| Title of sampler | QC Field Technician | Telephone number of sampler | |
| Laboratory sample identification | Mix G3-22-BAR-318, Set 3 | Linked DIME Sample ID | Unknown |
| The fabricator/manufacturer/facility name | Security Paving | Transportation Laboratory (TL) Number | Unknown |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | G3-22-BAR-318 |
|---|---|---|---|
| The truck number from where the sample was collected | Load 13 | The batch plant ticket number from where the sample was collected | 0 |
| Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Set 3 |
| A detailed description of where the material sample was collected | RTE 99 Barrier Wall, STA 74+05 (Point of Placement) | Where the material sample would have been placed if not sampled | Unknown |
| From Lot No. | 1 | Bag Lot No. | 1 |
Test Details
DIME Sample ID: 2024-03-15-53
DIME Test ID: 2024-03-15-53-3
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2024-05-23
Test Results
Input Type: Calculated
Tester's full name: Brian Lovett
Date of test: 03/15/2024
Temperature: 63 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/23/2024 ✔
