Summary for Test 2024-05-02-3-1

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 994696
DEA: 100Y7704
EFIS: 1015000008
DIST-CO-RTE-PM10-MPA-140-12.0/22.1
Award Date07/11/2023
Closeout Date09/24/2025
Work DescriptionREPLACE AC SURFACING, PLACE HMA AND RHMA, AND BRIDGE REPAIR.
Location DescriptionMARIPOSA COUNTY NEAR MARIPOSA FROM 1.3 MILES EAST OF CATHEYS VALLEY PARK TO 0.1 MILE NORTH OF ROUTE 49
QA Service Level1 (Verified on 05/09/2023)

Sample Information

Sample Taken Date05/02/2024 Sample Unique Key3
Date that the sample was received by the laboratory/organization performing the testing05/24/2024 Sample typeQuality Assurance
A brief description of the samplePortable Skid Test The quantity of what the sample constitutesSkid Testing
From where was the sample collectedJob Site First name of sampler or witnessed byJessie
Last name of sampler or witnessed byWilson Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameAT THE JOB SITE
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameMariposa Creek bridge
Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePolyester Concrete
Type of Traffic Control ProvidedStationary Lane Closure DIST-CO-RTE
Direction of TravelEast Post Mile21.60
Lanes to be TestedLane #1 Station

Test Details

DIME Sample ID: 2024-05-02-3
DIME Test ID: 2024-05-02-3-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2024-05-22

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 05/21/2024
Air Temperature: 60
Tire Pressure: 25
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: WARM
Direction/Lane #: WB: Westbound Direction of Travel
Edge used to measure reference distance: BEGIN BRIDGE
Edge used to measure position: LEFT OF WALL
Reference Distance 1: 40
Reference Distance 2: 43
Reference Distance 3: 46
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 12
Position for Stationing 2: 12
Position for Stationing 3: 12
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.48
Corrected Coefficients of Friction for Stationing 2: 0.48
Corrected Coefficients of Friction for Stationing 3: 0.48
Average Coefficient of Friction: 0.48
General comments (publicly viewable) (Max 1000 characters): MARIPOSA CREEK BRIDGE/BR#40-0002

Test was verified on 5/22/2024 ✔