Summary for Test 2024-05-13-75-2

Test performed: AASHTO T164-14

Project Information

Project IdentifiersProject ID: 66669
DEA: JMF-DATA
EFIS: JMF-DATA
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for storing JMF sample data
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date05/13/2024 Sample Unique Key75
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/13/2024
Sample typeQuality Control A brief description of the sampleRAP
The quantity of what the sample constitutes50lbs of RAP From where was the sample collectedSource
First name of sampler or witnessed byAndrew Last name of sampler or witnessed bySuarez
Title of samplerNot set Telephone number of samplerNot set
Laboratory sample identificationNot set Linked DIME Sample IDNot set
The fabricator/manufacturer/facility nameMartin Marietta - Santee Transportation Laboratory (TL) NumberNot set
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifierNot set
Structure nameNot set Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceMartin Marietta - Lakeside
Aggregate SizeNot set Aggregate SourceNot set
RAP StockpileNot set Stockpile Size (tons)Not set
Reclaimed Asphalt Pavement Mix NumberNot set

Test Details

DIME Sample ID: 2024-05-13-75
DIME Test ID: 2024-05-13-75-2
Testing Lab: Martin Marietta
Test Method: AASHTO T164-14: Standard Method of Test for Quantitative Extraction of Asphalt Binder from Hot Mix Asphalt (HMA) (Asphalt Binder Content)
Test Release Date: 2024-06-03

Test Results


Input Type: Calculated
Tester's full name: Christopher Lawless
Date of test: 05/13/2024
Corrected Asphalt Binder Content: 4.73 %
General comments (publicly viewable) (Max 1000 characters): Submitted from JMF - Andrew Suarez

Test was verified on 6/3/2024