Summary for Test 2024-05-16-43-2
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 995060 DEA: 081J2604 EFIS: 0818000012 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-215-R13.5/R19.5 |
| Award Date | 01/10/2024 |
| Closeout Date | Not set |
| Work Description | RHMA, REPLACE AC SURFACING, ROCK BLANKET, AND COMPOST. |
| Location Description | RIVERSIDE COUNTY IN MURRIETA AND MENIFEE FROM 1.0 MILE NORTH OF CLINTON KEITH ROAD TO 1.0 MILE NORTH OF NEWPORT ROAD |
| QA Service Level | 1 (Verified on 08/15/2023) |
Sample Information
| Sample Taken Date | 05/16/2024 | Sample Unique Key | 43 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/17/2024 |
| Sample type | Verification | A brief description of the sample | JMF verification sample |
| The quantity of what the sample constitutes | 1can | From where was the sample collected | Source |
| First name of sampler or witnessed by | Mary | Last name of sampler or witnessed by | Lanverde |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Martin Marietta (CCA) Lake Elsinore | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | Lot number | ||
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | Valero Marketing & Supply - Wilmington CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2024-05-16-43
DIME Test ID: 2024-05-16-43-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2024-06-26
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sm Ali
Date of test: 05/20/2024
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 171.531 grams
Mass of empty container #2: 172.801 grams
Mass of container #1 before test (m1i): 206.624 grams
Mass of container #2 before test (m2i): 207.510 grams
Mass of container #1 after test (m1f): 206.571 grams
Mass of container #2 after test (m2f): 207.455 grams
Average mass change: -0.155 percent
General comments (publicly viewable) (Max 1000 characters): - 0.155 + 0.006 = - 0.149
Test was verified on 6/26/2024 ✔