Summary for Test 2024-05-10-16-1
Test performed: AASHTO T269-14Project Information
| Project Identifiers | Project ID: 995482 DEA: 112T36U4 EFIS: 1122000243 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-5-37.4-52.6 |
| Award Date | 10/20/2023 |
| Closeout Date | Not set |
| Work Description | I-5 NCC SEGMENT 4C |
| Location Description | I-5 in San Diego County at Various Locations from Lomas Santa Fe Drive Undercrossing to 0.2 Mile North of Oceanside Undercrossing |
| QA Service Level | 1 (Verified on 11/20/2023) |
Sample Information
| Sample Taken Date | 05/10/2024 | Sample Unique Key | 16 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/09/2024 |
| Sample type | Quality Assurance | A brief description of the sample | HMA-A |
| The quantity of what the sample constitutes | 12 boxes | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Ben | Last name of sampler or witnessed by | Smith |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 0602-JMFV | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Vulcan CC | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | |
| Sublot number | HMA Mix Number | 320819 CC SJR | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2024-05-10-16
DIME Test ID: 2024-05-10-16-1
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2024-05-29
Test Results
Number of tests: 3
Is the sample lab compacted or field compacted?:
Input Type: Measured
Tester's full name: Daniel Smith
Date of test: 05/20/2024
| 1 | 2 | 3 | ||||
|---|---|---|---|---|---|---|
| 2.413 | 2.417 | 2.420 | ||||
| 2.487 | ||||||
3.0 % | 2.8 % | 2.7 % | ||||
2.8 % | ||||||
General comments (publicly viewable) (Max 1000 characters): Complies Target 4.0%
Test was verified on 5/29/2024 ✔
