Summary for Test 2024-05-13-1-1

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 1000023
DEA: 061F2104
EFIS: 0622000191
DIST-CO-RTE-PM06-KER-99,233-Var
Award Date03/13/2024
Closeout Date12/10/2024
Work DescriptionFURNISH AND PLACE POLYESTER CONCRETE OVERLAY.
Location DescriptionKERN COUNTY AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 01/08/2024)

Sample Information

Sample Taken Date05/13/2024 Sample Unique Key1
Date that the sample was received by the laboratory/organization performing the testing05/13/2024 Sample typeDepartment Acceptance
A brief description of the sampleTRIAL SLAB The quantity of what the sample constitutesPOLYESTER
From where was the sample collectedJob Site First name of sampler or witnessed byHARISH
Last name of sampler or witnessed byTHAKUR Title of sampler
Telephone number of sampler9152961873 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameJOB SITE
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePolyester Concrete
Type of Traffic Control ProvidedN/A DIST-CO-RTE
Direction of Travel Post Mile
Lanes to be Tested Station

Test Details

DIME Sample ID: 2024-05-13-1
DIME Test ID: 2024-05-13-1-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2024-05-16

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 05/15/2024
Air Temperature: 65
Tire Pressure: 25
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: WARM
Direction/Lane #: WB: Westbound Direction of Travel
Edge used to measure reference distance: BEGIN TRIAL SLAB
Edge used to measure position: LEFT OF WALL
Reference Distance 1: 2
Reference Distance 2: 5
Reference Distance 3: 8
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 7
Position for Stationing 2: 7
Position for Stationing 3: 7
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.50
Corrected Coefficients of Friction for Stationing 2: 0.50
Corrected Coefficients of Friction for Stationing 3: 0.50
Average Coefficient of Friction: 0.50
General comments (publicly viewable) (Max 1000 characters): TRIAL SLAB/BR # 50-0243

Test was verified on 5/16/2024 ✔