Summary for Test 2024-05-10-25-3
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 994812 DEA: 042K7204 EFIS: 0417000014 |
|---|---|
| DIST-CO-RTE-PM | 04-CC-4-R14.3/24.3 |
| Award Date | 03/23/2023 |
| Closeout Date | 10/06/2025 |
| Work Description | Pvmt rehabilitation, slab repl, ADA curb ramp and install guardrail. |
| Location Description | On state highway in Contra Costa County in and near Concord and Pittsburg from 0.3 miles east of Peralta Road Undercrossing to Loveridge Road Overcrossing. |
| QA Service Level | 1 (Verified on 05/10/2023) |
Sample Information
| Sample Taken Date | 05/10/2024 | Sample Unique Key | 25 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 05/10/2024 | Sample type | Quality Assurance |
| A brief description of the sample | 3/4" RHMA-G Mix | The quantity of what the sample constitutes | 750 Tons |
| From where was the sample collected | Supplier | First name of sampler or witnessed by | Nick |
| Last name of sampler or witnessed by | Hall | Title of sampler | Lab Technician |
| Telephone number of sampler | 7072999133 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Teichert Vernalis | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | 4 |
| Sublot number | 16 | HMA Mix Number | 30240532510A |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2024-05-10-25
DIME Test ID: 2024-05-10-25-3
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-05-24
Test Results
What temperature unit is used?: Celsius
Input Type: Calculated
Tester's full name: Nicholas Hall
Date of test: 05/10/2024
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 2171.2 g
Mass Loss: 180.1 g
Correction Factor (Percent by mass of HMA Specimen): 0.67 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.10 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 7.52 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/24/2024 ✔
