Summary for Test 2024-05-03-25-1
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 994600 DEA: 081N1704 EFIS: 0822000107 |
---|---|
DIST-CO-RTE-PM | 08-SBD-15-R108.0/R115.0 |
Award Date | 05/19/2023 |
Closeout Date | 08/29/2024 |
Work Description | RHMA, HIGH DENSITY POLYURETHANE INJECTION & COLD PLANE AC PAVEMENT. |
Location Description | SAN BERNARDINO COUNTY NEAR BARSTOW FROM 0.6 MILE NORTH OF CLYDE V. KANE REST AREA TO 0.3 MILE SOUTH OF BIRD DITCH BRIDGE |
QA Service Level | 1 (Verified on 07/19/2023) |
Sample Information
Sample Taken Date | 05/03/2024 | Sample Unique Key | 25 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/03/2024 |
Sample type | Department Acceptance | A brief description of the sample | 3/4" RHMA-S-SP, 1.0%LSM |
The quantity of what the sample constitutes | 2 BOXES OF RHMA-G, 1QT OF PG64-16, 1 QT OF BLENDED IL | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | FRNISCO | Last name of sampler or witnessed by | RUVALCABA |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 02224G-24 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Blue Diamond Materials-Victorville | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | 1 |
Sublot number | 19 | HMA Mix Number | 300072 LSM |
Test Details
DIME Sample ID: 2024-05-03-25
DIME Test ID: 2024-05-03-25-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-05-13
Test Results
What temperature unit is used?: Celsius
Input Type: Calculated
Tester's full name: Dylan Nault
Date of test: 05/10/2024
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 2177.6 g
Mass Loss: 165.6 g
Correction Factor (Percent by mass of HMA Specimen): 0.17 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.14 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 7.30 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/13/2024 ✔