Summary for Test 2024-05-09-3-1

Test performed: AASHTO T30-19

Project Information

Project IdentifiersProject ID: 995257
DEA: 09401004
EFIS: 0924000007
DIST-CO-RTE-PM09-INY-190-9.8-68.0
Award Date08/21/2023
Closeout Date03/13/2025
Work DescriptionEmergency Repair from Flood Damage to State Route 190 near Olancha, CA.
Location DescriptionState Route 190
QA Service Level1 (Verified on 10/19/2023)

Sample Information

Sample Taken Date05/09/2024 Sample Unique Key3
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/09/2024
Sample typeDepartment Acceptance A brief description of the sample3/4" HMA Post Plant Gradation Sample
The quantity of what the sample constitutes1 Box of HMA From where was the sample collectedSource
First name of sampler or witnessed byDerek Last name of sampler or witnessed byCarrington
Title of samplerMREAS Telephone number of sampler7609208313
Laboratory sample identification3890 Linked DIME Sample IDHMA-04
The fabricator/manufacturer/facility nameGranite 5 Bridges Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)00-00-0000
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedWindrow at Hot Plant
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2024-05-09-3
DIME Test ID: 2024-05-09-3-1
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2024-05-09

Test Results


Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: Yes
Input Type: Calculated
Tester's full name: Derek Carrington
Date of test: 05/09/2024
Cumulative Percent Passing
100 %
100 %
100 %
93 %
81 %
75 %
52 %
36 %
26 %
19 %
13 %
8 %
4.3 %
General comments (publicly viewable) (Max 1000 characters): HMA-04 Post Plant Gradation

Test was verified on 5/9/2024