Summary for Test 2024-04-30-39-3
Test performed: CTM 518-June 2010Project Information
Project Identifiers | Project ID: 214627 DEA: 05344904 EFIS: 0500000505 |
---|---|
DIST-CO-RTE-PM | 05-SBT-156-3/R8.2 |
Award Date | 05/19/2022 |
Closeout Date | Not set |
Work Description | SAN BENITO ROUTE 156 IMPROVEMENT PROJECT SAN BENITO RTE 156 IMPROVEMENT PROJECT; INCLUDES NEW BRIDGE AND WIDENING OF EXISTING BRIDGE. |
Location Description | SAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156 |
QA Service Level | 1 (Verified on 01/14/2020) |
Sample Information
Sample Taken Date | 04/30/2024 | Sample Unique Key | 39 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/30/2024 |
Sample type | Quality Control | A brief description of the sample | concrete |
The quantity of what the sample constitutes | 100 cy | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Jahmeen | Last name of sampler or witnessed by | McCabe |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Don Chapin | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | CAS5901 |
---|---|---|---|
The truck number from where the sample was collected | 1 | The batch plant ticket number from where the sample was collected | 241413 |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Concrete truck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2024-04-30-39
DIME Test ID: 2024-04-30-39-3
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2024-05-08
Test Results
Input Type: Calculated
Tester's full name: Jahmeen Lopez
Date of test: 04/30/2024
Unit weight of the concrete: 147.4 lb/ft^3
Cement content: 0 lb/yd^3
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 5/8/2024 ✔