Summary for Test 2024-05-01-60-1
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 994897 DEA: 081G8804 EFIS: 0816000098 |
---|---|
DIST-CO-RTE-PM | 08-SBD,-15-6.7/R22.3 |
Award Date | 08/11/2023 |
Closeout Date | Not set |
Work Description | ROCK BLANKET, STAMPED CONCRETE, MGS AND VEGETATION CONTROL. |
Location Description | SAN BERNARDINO COUNTY IN AND NEAR FONTANA AND RANCHO CUCAMONGA FROM BASELINE AVENUE UNDERCROSSING TO 0.9 MILE NORTH OF ROUTE 15/138 SEPARATION |
QA Service Level | 1 (Verified on 08/15/2023) |
Sample Information
Sample Taken Date | 05/01/2024 | Sample Unique Key | 60 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/01/2024 |
Sample type | Department Acceptance | A brief description of the sample | Subgrade |
The quantity of what the sample constitutes | 13.3 kg | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Kalpesh | Last name of sampler or witnessed by | Patel |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | CTM 231 TEST LOCATION | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
---|---|---|---|
The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | I-15 SB Off-Ramp @ Glen Helen Pkwy Gore Area | |
Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2024-05-01-60
DIME Test ID: 2024-05-01-60-1
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-05-08
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Kalpesh Patel
Date of test: 05/01/2024
Sum of Count or Density: 2833.00 g/cc
Average of Count or Density: 944.00 g/cc
Sum of Moisture Count: 377.00 g/cc
Average of Moisture Count: 126.00 g/cc
Count Ratio Density: 0.50
Count Ratio Moisture: 0.19
Calculated Percent Relative Compaction: 99.1 %
Reported Percent Relative Compaction: 99 %
General comments (publicly viewable) (Max 1000 characters): Density Spec 95%
Test was verified on 5/8/2024 ✔