Summary for Test 2024-04-30-15-5

Test performed: AASHTO T96-02r10

Project Information

Project IdentifiersProject ID: 995257
DEA: 09401004
EFIS: 0924000007
DIST-CO-RTE-PM09-INY-190-9.8-68.0
Award Date08/21/2023
Closeout Date03/13/2025
Work DescriptionEmergency Repair from Flood Damage to State Route 190 near Olancha, CA.
Location DescriptionState Route 190
QA Service Level1 (Verified on 10/19/2023)

Sample Information

Sample Taken Date04/30/2024 Sample Unique Key15
Date that the sample was received by the laboratory/organization performing the testing04/30/2024 Sample typeVerification
A brief description of the sample3/4" Coldfeed & RAP The quantity of what the sample constitutes1 Bag of Virgin Agg & 1 Bag of RAP
From where was the sample collectedSource First name of sampler or witnessed byDerek
Last name of sampler or witnessed byCarrington Title of samplerMREAS
Telephone number of sampler7609208313 Laboratory sample identification3884
Linked DIME Sample ID The fabricator/manufacturer/facility nameGranite - 5 Bridges Plant
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)00-000-0000
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedSample Device at Hot Plant
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2024-04-30-15
DIME Test ID: 2024-04-30-15-5
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: AASHTO T96-02r10: Standard Method of Test for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine (Los Angeles Rattler)
Test Release Date: 2024-05-02

Test Results


Input Type: Calculated
Tester's full name: Derek Carrington
Date of test: 05/02/2024
Grading designation: B
Percent loss after 100 revolutions: 7 %
Percent loss after 500 revolutions: 28.2 %
General comments (publicly viewable) (Max 1000 characters): JMF Renewal

Test was verified on 5/2/2024 ✔