Summary for Test 2024-05-01-10-2

Test performed: CTM 216-June 2011

Project Information

Project IdentifiersProject ID: 994351
DEA: 07322004
EFIS: 0716000053
DIST-CO-RTE-PM07-LA-118-R11.0/R14.0
Award Date01/11/2023
Closeout DateNot set
Work DescriptionCONSTRUCT STORMWATER TREATMENT DEVICES.
Location DescriptionTHE CITY AND COUNTY OF LOS ANGELES FROM 0.1 MILE WEST OF ARLETA AVENUE UNDERCROSSING TO 0.1 MILE WEST OF ROUTE 118/210 SEPARATION
QA Service Level1 (Verified on 06/08/2023)

Sample Information

Sample Taken Date05/01/2024 Sample Unique Key10
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/01/2024
Sample typeDepartment Acceptance A brief description of the sampleGSRD #9 off EB118 Paxton-1st lift GSRD #9 off EB118 Paxton-1st lift
The quantity of what the sample constitutes6 sy From where was the sample collectedJob Site
First name of sampler or witnessed bySopheak Last name of sampler or witnessed byChong
Title of samplerTEC Telephone number of sampler2138170174
Laboratory sample identification24-0842 Linked DIME Sample ID
The fabricator/manufacturer/facility namePowell Construction Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameGSRD #9 off EB118 Paxton-1st lift Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleStructural Backfill
The fabricator/manufacturer designation for the samplefrom various locations at SBF A detailed description of where the material sample was collectedJobsite
Where the material sample would have been placed if not sampledJobsite

Test Details

DIME Sample ID: 2024-05-01-10
DIME Test ID: 2024-05-01-10-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2024-05-01

Test Results


Is oversize material: No
Input Type: Measured
Tester's full name: Sopheak Chong
Date of test: 05/01/2024
In-place wet density: 1.96
Highest adjust wet density: 2.15
% Moisture: 13.1 %
Optimum Moisture: 13.1 %
Relative compaction: 91
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/1/2024