Summary for Test 2024-03-14-64-2

Test performed: CTM 203-February 2008

Project Information

Project IdentifiersProject ID: 1000130
DEA: 021J3504
EFIS: 0220000061
DIST-CO-RTE-PM02-SHA-29-41.1/55.3
Award DateNot set
Closeout DateNot set
Work DescriptionDiddy Roost Culverts - Drainage System Restoration
Location DescriptionNot set
QA Service Level1 (Verified on 10/24/2024)

Sample Information

Sample Taken Date03/14/2024 Sample Unique Key64
Date that the sample was received by the laboratory/organization performing the testing03/19/2024 Sample typePreliminary
A brief description of the sample1 bag of Soil The quantity of what the sample constitutesSoil for use in Embankment
From where was the sample collectedSource First name of sampler or witnessed byScott
Last name of sampler or witnessed byLewis Title of samplerSenior Engineering Geologist
Telephone number of sampler Laboratory sample identificationD79447
Linked DIME Sample ID The fabricator/manufacturer/facility nameIn situ
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedEmbankment near culvert outlet at south side, 02-Sha-299-41.17, 0 - 0.7 ft depth.
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2024-03-14-64
DIME Test ID: 2024-03-14-64-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: CTM 203-February 2008: Mechanical Analysis of Soils
Test Release Date: 2024-04-25

Test Results


What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Input Type: Calculated
Tester's full name: Dennis Hickey
Date of test: 04/19/2024
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 99 %
Cumulative percent passing the 1 in. sieve: 90 %
Cumulative percent passing the 3/4 in. sieve: 85 %
Cumulative percent passing the 1/2 in. sieve: 79 %
Cumulative percent passing the 3/8 in. sieve: 75 %
Cumulative percent passing the #4 sieve: 65 %
Cumulative percent passing the #8 sieve: 56 %
Cumulative percent passing the #16 sieve: 47 %
Cumulative percent passing the #30 sieve: 40 %
Cumulative percent passing the #50 sieve: 34 %
Cumulative percent passing the #100 sieve: 29 %
Cumulative percent passing the #200 sieve: 25 %
Cumulative Percent Passing on 5 Microns: 13 %
Cumulative Percent Passing on 1 Micron: 5 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/25/2024 ✔