Summary for Test 2024-04-10-70-2

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 4134
DEA: 072X0004
EFIS: 0700000618
DIST-CO-RTE-PM07-LA-60-30.0/31.2
Award Date04/18/2008
Closeout DateNot set
Work DescriptionREPLACE FAILED SLABS ON LA-60 FROM ATLANTIC BLVD U/C TO GREENWOOD AVENUE O/C
Location DescriptionNot set
QA Service Level1 (Verified on 05/01/2012)

Sample Information

Sample Taken Date04/10/2024 Sample Unique Key70
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/10/2024
Sample typeDepartment Acceptance A brief description of the sampleSoils for Subgrade
The quantity of what the sample constitutes22CY From where was the sample collectedJob Site
First name of sampler or witnessed byJacinto Last name of sampler or witnessed byVillanueva
Title of samplerTEC Telephone number of sampler8182096574
Laboratory sample identification24-0628 Linked DIME Sample ID
The fabricator/manufacturer/facility nameRassmunson Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleSubgrade
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedFrom various locations at subgrade.
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2024-04-10-70
DIME Test ID: 2024-04-10-70-2
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-04-24

Test Results


Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Jacinto Villanueva
Date of test: 04/10/2024
Gage No.: 60247
Test No.: 1
Nuclear By: Jacinto Villanueva
Non-Bias Plan No.: 3
Depth: 0.5
Material No.: jobsite
Material Type: subgrade
Impact By: Jacinto Villanueva
Standard Count Density: 2073 g/cc
Count or Density 1: 2.14 g/cc
Count or Density 2: 2.18 g/cc
Count or Density 3: 2.22 g/cc
Standard Count Moisture: 0.19 g/cc
Moisture Count 1: 0.18 g/cc
Moisture Count 2: 0.21 g/cc
Moisture Count 3: 0.19 g/cc
Sum of Count or Density: 6.54 g/cc
Average of Count or Density: 2.18 g/cc
Sum of Moisture Count: 0.58 g/cc
Average of Moisture Count: 0.19 g/cc
Calculated Percent Relative Compaction: 96.5 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/24/2024