Summary for Test 2023-06-16-77-3

Test performed: ASTM C1611-21

Project Information

Project IdentifiersProject ID: 993815
DEA: 081C0814
EFIS: 0816000086
DIST-CO-RTE-PM08-RIV-10-R60.7/R74.3
Award Date03/28/2022
Closeout Date01/21/2026
Work DescriptionI-10 PAVEMENT REHABILITATION (SEGMENT 1) PROJECT
Location DescriptionCoachella
QA Service Level1 (Verified on 05/03/2022)

Sample Information

Sample Taken Date06/16/2023 Sample Unique Key77
Date that the sample was received by the laboratory/organization performing the testing06/16/2023 Sample typeQuality Control
A brief description of the sampleT-II/V Cement The quantity of what the sample constitutes6.5
From where was the sample collectedManufacturer First name of sampler or witnessed byManny
Last name of sampler or witnessed byFabionar Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameConFab California, LLC Shafter
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberSCC-S8.5-0FG
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected3574
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedSampled from wheelbarrow collected from chute of ready mix truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-06-16-77
DIME Test ID: 2023-06-16-77-3
Testing Lab: Con-Fab California Corporation - Shafter
Test Method: ASTM C1611-21: Standard Test Method for Slump Flow of Self-Consolidating Concrete
Test Release Date: 2024-06-07

Test Results


What unit system is used for measurements?: inches
Input Type: Calculated
Tester's full name: Manny Fabionar
Date of test: 06/16/2023
Filling the mold procedure: Filling Procedure B (Inverted Mold)
Diameter 1: 26 in
Diameter 2: 26 in
Visual Stability Index: 1
Slump Flow: 26 in
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/7/2024 ✔