Summary for Test 2023-09-18-119-2
Test performed: ASTM D2419-14Project Information
Project Identifiers | Project ID: 209698 DEA: 072332E4 EFIS: 0700000391 COOP: 0705187 |
---|---|
DIST-CO-RTE-PM | 07-LA-I-5-45.4/54 |
Award Date | 07/01/2021 |
Closeout Date | Not set |
Work Description | Addition of 14 miles of HOV lanes in both directions would extend existing carpool lanes on the I- 5 in San Fernando Valley to Santa Clarita Valley |
Location Description | The I-5 North Capacity Enhancements Project focuses on improvements to the I-5 freeway from cities of Santa Clarita and Castaic, beginning at the SR-14 interchange to Parker Rd. |
QA Service Level | 2 (Verified on 02/03/2021) |
Sample Information
Sample Taken Date | 09/18/2023 | Sample Unique Key | 119 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/18/2023 |
Sample type | Quality Control | A brief description of the sample | 1 Bucket of 1/2", 1 Bucket of 3/8", One Bucket of Sand |
The quantity of what the sample constitutes | 1 Bucket of 1/2", 1 Bucket of 3/8", One Bucket of Sand | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Benjamin | Last name of sampler or witnessed by | Aragon |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Con-Fab California, LLC - Shafter | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Con-Fab California, LLC |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Stockpile at the Plant | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1/2 inch | |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-09-18-119
DIME Test ID: 2023-09-18-119-2
Testing Lab: Con-Fab California, LLC
Test Method: ASTM D2419-14: Standard Test Method for Sand Equivalent Value of Soils and Fine Aggregate
Test Release Date: 2024-06-11
Test Results
How many times will the test be run?: 3 Times
Input Type: Calculated
Tester's full name: Patrick Baddu
Date of test: 09/18/2023
Sand Equivalent: 77
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/11/2024 ✔