Summary for Test 2023-09-08-74-3

Test performed: ASTM C1611-21

Project Information

Project IdentifiersProject ID: 209698
DEA: 072332E4
EFIS: 0700000391
COOP: 0705187
DIST-CO-RTE-PM07-LA-I-5-45.4/54
Award Date07/01/2021
Closeout DateNot set
Work DescriptionAddition of 14 miles of HOV lanes in both directions would extend existing carpool lanes on the I- 5 in San Fernando Valley to Santa Clarita Valley
Location DescriptionThe I-5 North Capacity Enhancements Project focuses on improvements to the I-5 freeway from cities of Santa Clarita and Castaic, beginning at the SR-14 interchange to Parker Rd.
QA Service Level2 (Verified on 02/03/2021)

Sample Information

Sample Taken Date09/08/2023 Sample Unique Key74
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/11/2023
Sample typeQuality Control A brief description of the sampleT-II/V Cement
The quantity of what the sample constitutes11 From where was the sample collectedManufacturer
First name of sampler or witnessed byBenjamin Last name of sampler or witnessed byAragon
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameConFab California, LLC Shafter Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberSCC-S8.5-0FG
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected3741
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedSampled from wheelbarrow collected from chute of ready mix truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-09-08-74
DIME Test ID: 2023-09-08-74-3
Testing Lab: Con-Fab California, LLC
Test Method: ASTM C1611-21: Standard Test Method for Slump Flow of Self-Consolidating Concrete
Test Release Date: 2024-06-11

Test Results


What unit system is used for measurements?: inches
Input Type: Calculated
Tester's full name: Benjamin Aragon
Date of test: 09/08/2023
Filling the mold procedure: Filling Procedure B (Inverted Mold)
Diameter 1: 25 in
Diameter 2: 25.5 in
Visual Stability Index: 1
Slump Flow: 25.5 in
General comments (publicly viewable) (Max 1000 characters): Reported as 25.25 inches

Test was verified on 6/11/2024