Summary for Test 2024-04-09-65-3

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 214486
DEA: 080K1224
EFIS: 0815000244
DIST-CO-RTE-PM08-SBD-15-R28.6/37.5
Award DateNot set
Closeout DateNot set
Work DescriptionREHBILIATATE EXISTING MAINLINE AND RAMP PAVEMENT
Location DescriptionSAN BERNARDINO COUNTY IN HESPERIA AND VICTORVILLE FROM OAK HILL ROAD OVERCROSSING TO 0.1 MILE SOUTH OF BEAR VALLEY ROAD OVERCROSSING
QA Service Level1 (Verified on 06/23/2021)

Sample Information

Sample Taken Date04/09/2024 Sample Unique Key65
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/09/2024
Sample typeDepartment Acceptance A brief description of the sample1x 4 PCC Aggregates
The quantity of what the sample constitutes3 bags From where was the sample collectedManufacturer
First name of sampler or witnessed byDavid Last name of sampler or witnessed byM.
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCemex Lytle Creek Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-36-0040
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedAt the plant
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1 inch
The concrete mix design numberG3-22-PCC-273 Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2024-04-09-65
DIME Test ID: 2024-04-09-65-3
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2024-04-16

Test Results


Number of tests: 2
Input Type: Calculated
Tester's full name: Francisco Ruvalcaba
Date of test: 04/11/2024
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 5.1
Sand reading (test 1): 4.4
Clay reading (test 2): 5.7
Sand reading (test 2): 4.7
Sand equivalent (test 1): 87
Sand equivalent (test 2): 83
Sand equivalent before temperature correction: 85
Sand equivalent after temperature correction: 85
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/16/2024