Summary for Test 2024-04-11-42-2
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 994962 DEA: 07357304 EFIS: 0719000062 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-6.6/13.1 |
| Award Date | 04/27/2023 |
| Closeout Date | Not set |
| Work Description | REPLACE CONCRETE SLABS AND MEDIAN BARRIER, |
| Location Description | LOS ANGELES COUNTY IN SANTA FE SPRINGS, DOWNEY AND CITY OF COMMERCE FROM 0.2 MILE SOUTH OF ROUTE 5/605 SEPARATION TO 0.1 MILE NORT |
| QA Service Level | 1 (Verified on 07/13/2023) |
Sample Information
| Sample Taken Date | 04/11/2024 | Sample Unique Key | 42 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/12/2024 |
| Sample type | Verification | A brief description of the sample | JMF verification sample |
| The quantity of what the sample constitutes | 1can | From where was the sample collected | Source |
| First name of sampler or witnessed by | Alejandro | Last name of sampler or witnessed by | Alejandro QC |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | AAA-Irwindale | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-10 |
|---|---|---|---|
| Modified | Lot number | ||
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2024-04-11-42
DIME Test ID: 2024-04-11-42-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2024-05-04
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sm Ali
Date of test: 04/15/2024
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 170.720 grams
Mass of empty container #2: 172.871 grams
Mass of container #1 before test (m1i): 205.631 grams
Mass of container #2 before test (m2i): 207.686 grams
Mass of container #1 after test (m1f): 205.640 grams
Mass of container #2 after test (m2f): 207.696 grams
Average mass change: 0.027 percent
General comments (publicly viewable) (Max 1000 characters): 0.027 + 0.006 = 0.033
Test was verified on 5/4/2024 ✔
