Summary for Test 2024-03-28-45-1
Test performed: AASHTO T27-14Project Information
| Project Identifiers | Project ID: 215314 DEA: 07333004 EFIS: 0716000298 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5,5-15.1/22.9 |
| Award Date | 10/20/2022 |
| Closeout Date | 08/20/2025 |
| Work Description | PROJECT PILOT 1 |
| Location Description | LOS ANGELES COUNTY IN AND NEAR LOS ANGELES ON ROUTE 5 FROM 0.1 MILE SOUTH OF CALZONA STREET TO 0.1 MILE SOUTH OF RIVERSIDE DRIVE AND ROUTE 2 AT LOS ANGELES REGIONAL TRANSPORTATION MANAGEMENT CENTER |
| QA Service Level | 1 (Verified on 07/12/2021) |
Sample Information
| Sample Taken Date | 03/28/2024 | Sample Unique Key | 45 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/09/2024 | Sample type | Department Acceptance |
| A brief description of the sample | 3/4 HMA-A | The quantity of what the sample constitutes | 400 tons |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | victor |
| Last name of sampler or witnessed by | Pham | Title of sampler | |
| Telephone number of sampler | 2137924794 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | All American Asphalt-Irwindale | |
| Transportation Laboratory (TL) Number | 0328B1 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0005 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | 3/4 HMA-A | The fabricator/manufacturer designation for the sample | mix 105793 |
| The plant number | Irwindale | A detailed description of where the material sample was collected | Conveyor Belt |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | 105793 | Lot number | |
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2024-03-28-45
DIME Test ID: 2024-03-28-45-1
Testing Lab: CT D07 - Plant Services, Unit 1841
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Test Release Date: 2024-04-18
Test Results
What type of gradation is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Does this test use 1/4 sieve? (question for HMA Gradation Type): No
Has the fine aggregate sample been reduced?: No
Input Type: Calculated
Tester's full name: Victor Pham
Date of test: 04/10/2024
| Cumulative Percent Passing | ||||||
|---|---|---|---|---|---|---|
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 95 % | ||||||
| 83 % | ||||||
| 72 % | ||||||
| 48 % | ||||||
| 32 % | ||||||
| 22 % | ||||||
| 13 % | ||||||
| 10 % | ||||||
| 7 % | ||||||
| 5.3 % | ||||||
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/18/2024 ✔
