Summary for Test 2024-04-10-32-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 994332 DEA: 11430444 EFIS: 1118000204 |
|---|---|
| DIST-CO-RTE-PM | 11-IMP-8,78-Var |
| Award Date | 12/22/2022 |
| Closeout Date | 01/27/2025 |
| Work Description | REHABILITATE BRIDGES, CONCRETE BARRIERS, TERMINAL SYSTEMS, ELECTRICAL. |
| Location Description | IMPERIAL COUNTY AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 02/21/2023) |
Sample Information
| Sample Taken Date | 04/10/2024 | Sample Unique Key | 32 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/11/2024 |
| Sample type | Quality Assurance | A brief description of the sample | 1/2" HMA JMFR |
| The quantity of what the sample constitutes | 12 boxes | From where was the sample collected | Source |
| First name of sampler or witnessed by | Joe | Last name of sampler or witnessed by | Loper |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 8808-JMFR | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | API Gateway | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | 1 |
| Sublot number | 1 | HMA Mix Number | 2 |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2024-04-10-32
DIME Test ID: 2024-04-10-32-1
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-05-21
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Daniel Smith / J Seymour
Date of test: 04/12/2024
Test procedure used?: Method A
Mass of the specimen basket assembly: 4007.3 g
Mass of the specimen and specimen basket assembly prior to ignition: 5562.2 g
Mass of HMA Sample prior to ignition: 1554.9 g
Mass Loss: 78.1 g
Mass of aggregate remaining after ignition: 1476.8 g
Correction Factor (Percent by mass of HMA Specimen): 0.33 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 4.69 %
General comments (publicly viewable) (Max 1000 characters): Target m 4.50% Tested 4.69%
Test was verified on 5/21/2024 ✔
