Summary for Test 2024-01-26-50-2
Test performed: CTM 557-June 2020Project Information
Project Identifiers | Project ID: 214649 DEA: 07316004 EFIS: 0715000194 |
---|---|
DIST-CO-RTE-PM | 07-LA-14-60.70 |
Award Date | 02/07/2023 |
Closeout Date | Not set |
Work Description | REHABILITATION FOR THE ON/OFF RAMPS AND ADJACENT SHOULDERS. UPGRADING METAL BEAM GUARDRAILS, AC DIKES, SIGN PANELS, CURB RAMPS, TRAFFIC LOOPS DETECTORS, AND SOME OTHER HIGHWAY APPURTENANCES. |
Location Description | ROUTE 14 FROM PALMDALE BLVD TO KERN COUNTRY LINE. |
QA Service Level | 1 (Verified on 01/29/2020) |
Sample Information
Sample Taken Date | 01/26/2024 | Sample Unique Key | 50 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/26/2024 |
Sample type | Quality Assurance | A brief description of the sample | 6x12 concrete cylinders |
The quantity of what the sample constitutes | 10 cubic yards | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Eriberto | Last name of sampler or witnessed by | Aragon |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 24-0267 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | SCI-12622-1 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 16 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | wheelbarrow | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2024-01-26-50
DIME Test ID: 2024-01-26-50-2
Testing Lab: Alta Vista Solutions - Whittier
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2024-03-11
Test Results
Input Type: Measured
Tester's full name: Eriberto Aragon
Date of test: 01/26/2024
Temperature: 71 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/11/2024 ✔