Summary for Test 2024-02-23-21-3
Test performed: ASTM D5329-16Project Information
| Project Identifiers | Project ID: 994397 DEA: 073393U4 EFIS: 0722000031 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-605-R11.4/R19.5 |
| Award Date | 02/14/2023 |
| Closeout Date | 03/13/2025 |
| Work Description | CONSTRUCT DPPIA DEVICES AND MODIFY LIGHTING SYSTEMS. |
| Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF SLAUSON AVENUE UNDERCROSSING TO 0.5 MILE NORTH OF VALLEY BOULEVARD UNDERCROSSING |
| QA Service Level | 1 (Verified on 07/13/2023) |
Sample Information
| Sample Taken Date | 02/23/2024 | Sample Unique Key | 21 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/29/2024 |
| Sample type | Verification | A brief description of the sample | Asphalt Rubber Binder |
| The quantity of what the sample constitutes | 1qt. | From where was the sample collected | Source |
| First name of sampler or witnessed by | Gerardo | Last name of sampler or witnessed by | Zubieta |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | AAA-Irwindale | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Rubber Binder | Asphalt modifier supplier | |
|---|---|---|---|
| Performance Grade | PG 64-16 | Lot number | |
| Sublot number | Asphalt Rubber Binder Mix Number |
Test Details
DIME Sample ID: 2024-02-23-21
DIME Test ID: 2024-02-23-21-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: ASTM D5329-16: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Test Release Date: 2024-03-12
Test Results
Input Type: Calculated
Tester's full name: Sm Ali
Date of test: 02/29/2024
Temperature: 25 C
Ball Penetration (P1): 2 mm
Final Dial reading (F1): 76 mm
Ball Penetration (P2): 1 mm
Final Dial reading (F2): 74 mm
Ball Penetration (P3): 1 mm
Final Dial reading (F3): 74 mm
Resilience 1: 26 %
Resilience 2: 27 %
Resilience 3: 27 %
Average Resilience: 27 %
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/12/2024 ✔
