Summary for Test 2024-02-23-16-2
Test performed: AASHTO T240-17Project Information
| Project Identifiers | Project ID: 994397 DEA: 073393U4 EFIS: 0722000031 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-605-R11.4/R19.5 |
| Award Date | 02/14/2023 |
| Closeout Date | 03/13/2025 |
| Work Description | CONSTRUCT DPPIA DEVICES AND MODIFY LIGHTING SYSTEMS. |
| Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF SLAUSON AVENUE UNDERCROSSING TO 0.5 MILE NORTH OF VALLEY BOULEVARD UNDERCROSSING |
| QA Service Level | 1 (Verified on 07/13/2023) |
Sample Information
| Sample Taken Date | 02/23/2024 | Sample Unique Key | 16 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/26/2024 |
| Sample type | Verification | A brief description of the sample | Asphalt Binder Sample |
| The quantity of what the sample constitutes | 1can | From where was the sample collected | Source |
| First name of sampler or witnessed by | Gerardo | Last name of sampler or witnessed by | Zubieta |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | AAA-Irwindale | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | Lot number | ||
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2024-02-23-16
DIME Test ID: 2024-02-23-16-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2024-02-29
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Sunday Agude
Date of test: 02/28/2024
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 170.719 grams
Mass of empty container #2: 172.889 grams
Mass of container #1 before test (m1i): 205.914 grams
Mass of container #2 before test (m2i): 207.941 grams
Mass of container #1 after test (m1f): 205.883 grams
Mass of container #2 after test (m2f): 207.911 grams
Average mass change: -0.087 percent
General comments (publicly viewable) (Max 1000 characters): -0.087 + 0.006 = -0.081
Test was verified on 2/29/2024 ✔
