Summary for Test 2024-02-25-1-8

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 215753
DEA: 050N72U4
EFIS: 0520000169
DIST-CO-RTE-PM05-SB-101-4.4/R7.7
Award Date06/05/2021
Closeout DateNot set
Work DescriptionPlease cc Office Engineer Ni Nyoman Paul on reports sent to RE and SR. Construct High Occupancy Vehicle (HOV) lanes on U.S. Route 101 and rehabilitation - Segment 4B.
Location Description101 freeway in Summerland, CA
QA Service Level1 (Verified on 05/06/2021)

Sample Information

Sample Taken Date02/25/2024 Sample Unique Key1
Date that the sample was received by the laboratory/organization performing the testing02/25/2024 Sample typeDepartment Acceptance
A brief description of the sampleBRIDGE DECK The quantity of what the sample constitutesBRIDGE DECK
From where was the sample collectedJob Site First name of sampler or witnessed byHARISH
Last name of sampler or witnessed byTHAKUR Title of sampler
Telephone number of sampler9152961873 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameJOB SITE
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedBehind K-Rail/Barrier DIST-CO-RTE
Direction of Travel Post Mile
Lanes to be Tested Station

Test Details

DIME Sample ID: 2024-02-25-1
DIME Test ID: 2024-02-25-1-8
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2024-02-28

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: Harish Thakur
Date of test: 02/27/2024
Air Temperature: 58
Tire Pressure: 24
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: SUNNY
Direction/Lane #: NB: Northbound Direction of Travel
Edge used to measure reference distance: BEGIN BRIDGE
Edge used to measure position: LEFT OF WALL
Reference Distance 1: 2
Reference Distance 2: 5
Reference Distance 3: 8
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 25
Position for Stationing 2: 25
Position for Stationing 3: 25
Percent Grade for 1st Stationing: 0.0
Percent Grade for 2nd Stationing: 0.0
Percent Grade for 3rd Stationing: 0.0
Corrected Coefficients of Friction for Stationing 1: 0.39
Corrected Coefficients of Friction for Stationing 2: 0.39
Corrected Coefficients of Friction for Stationing 3: 0.37
Average Coefficient of Friction: 0.38
General comments (publicly viewable) (Max 1000 characters): TORO CREEK/ BR #51-0363 APPROACH

Test was verified on 2/28/2024