Summary for Test 2024-02-15-10-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 215314 DEA: 07333004 EFIS: 0716000298 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5,5-15.1/22.9 |
| Award Date | 10/20/2022 |
| Closeout Date | 08/20/2025 |
| Work Description | PROJECT PILOT 1 |
| Location Description | LOS ANGELES COUNTY IN AND NEAR LOS ANGELES ON ROUTE 5 FROM 0.1 MILE SOUTH OF CALZONA STREET TO 0.1 MILE SOUTH OF RIVERSIDE DRIVE AND ROUTE 2 AT LOS ANGELES REGIONAL TRANSPORTATION MANAGEMENT CENTER |
| QA Service Level | 1 (Verified on 07/12/2021) |
Sample Information
| Sample Taken Date | 02/15/2024 | Sample Unique Key | 10 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/15/2024 |
| Sample type | Department Acceptance | A brief description of the sample | SB5 Indiana off ramp pavement structure section 1&2 |
| The quantity of what the sample constitutes | 677 sq | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Sopheak | Last name of sampler or witnessed by | Chong |
| Title of sampler | TEC | Telephone number of sampler | 2138170174 |
| Laboratory sample identification | 24-0345 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Powell Construcion | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | SB5 Indiana off ramp pavement structure section 1&2 | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | Subgrade |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | various location sugrade | A detailed description of where the material sample was collected | Jobsite |
| Where the material sample would have been placed if not sampled | Jobsite |
Test Details
DIME Sample ID: 2024-02-15-10
DIME Test ID: 2024-02-15-10-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2024-03-11
Test Results
Method Type:: Direct Read
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Sopheak Chong
Date of test: 02/15/2024
Gage No.: 60137
Test No.: 1
Nuclear By: Sopheak Chong
Non-Bias Plan No.: 2
Depth: 6
Material No.: Native
Material Type: Subgrade
Impact By: Sopheak Chong
Standard Count Density: 2225 g/cc
Count or Density 1: 2.18 g/cc
Count or Density 2: 2.27 g/cc
Count or Density 3: 2.22 g/cc
Standard Count Moisture: 653 g/cc
Moisture Count 1: 0.21 g/cc
Moisture Count 2: 0.23 g/cc
Moisture Count 3: 0.14 g/cc
Sum of Count or Density: 6.67 g/cc
Average of Count or Density: 2.22 g/cc
Sum of Moisture Count: 0.58 g/cc
Average of Moisture Count: 0.19 g/cc
Calculated Percent Relative Compaction: 96.7 %
Reported Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/11/2024 ✔
