Summary for Test 2022-08-19-80-2

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 215220
DEA: 07210624
EFIS: 0719000068
DIST-CO-RTE-PM07-LA,SBD-71-1.8/R4.7&R0.0/R0.2
Award Date02/05/2021
Closeout DateNot set
Work DescriptionPLACE STRUCTURE CONCRETE RETAINING WALLS & BOX CULVERT AND PLACE JPCP.
Location DescriptionIN LOS ANGELES AND SAN BERNARDINO COUNTIES IN POMONA AND CHINO HILLS FROM 0.2 MILE SOUTH OF MISSION BOULEVARD OVERCROSSING TO 0.2 MILE OF SAN BERNARDINO COUNTY LINE.
QA Service Level1 (Verified on 03/24/2021)

Sample Information

Sample Taken Date08/19/2022 Sample Unique Key80
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing08/19/2022
Sample typeVerification A brief description of the samplepcc agg
The quantity of what the sample constitutes47CY From where was the sample collectedSupplier
First name of sampler or witnessed byLuis Last name of sampler or witnessed byAcosta
Title of samplerTET Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCemex Fontana Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-36-0040
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedstock pile
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1 inch
The concrete mix design number1610838 Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2022-08-19-80
DIME Test ID: 2022-08-19-80-2
Testing Lab: CT D07 - Plant Services
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2024-02-16

Test Results


Number of tests: 3
Input Type: Calculated
Tester's full name: Angel T
Date of test: 08/24/2022
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 5
Sand reading (test 1): 4.4
Clay reading (test 2): 5.1
Sand reading (test 2): 4.5
Clay reading (test 3): 4.8
Sand reading (test 3): 4.2
Sand equivalent (test 1): 88
Sand equivalent (test 2): 89
Sand equivalent (test 3): 88
Sand equivalent before temperature correction: 89
Sand equivalent after temperature correction: 89
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 2/16/2024