Summary for Test 2023-06-08-96-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 993333 DEA: 04264724 EFIS: 0419000068 |
|---|---|
| DIST-CO-RTE-PM | 04-MRN-101-R20.8/27.1 |
| Award Date | 04/26/2022 |
| Closeout Date | Not set |
| Work Description | CIP BRIDGES, CONSTRUCT ROADWAY, RETAINING WALLS AND MODIFY ELECTRICAL. |
| Location Description | MARIN COUNTY IN AND NEAR NOVATO FROM 0.1 MILE SOUTH OF FRANKLIN AVENUE OVERHEAD TO 0.5 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE |
| QA Service Level | 1 (Verified on 11/01/2021) |
Sample Information
| Sample Taken Date | 06/08/2023 | Sample Unique Key | 96 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/09/2023 | Sample type | Quality Assurance |
| A brief description of the sample | 1/2 HMA | The quantity of what the sample constitutes | 4 boxes |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Anthony |
| Last name of sampler or witnessed by | Valdez | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Dutra Materials Richmond | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | 1 |
| Sublot number | 8 | HMA Mix Number | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2023-06-08-96
DIME Test ID: 2023-06-08-96-1
Testing Lab: CT D04 - Petaluma Field Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-02-12
Test Results
What temperature unit is used?: Celsius
Input Type: Calculated
Tester's full name: Anthony Valdez
Date of test: 06/08/2023
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 1562.8 g
Mass Loss: 100.8 g
Correction Factor (Percent by mass of HMA Specimen): 1.01 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.19 %
Test Temperature: 482 C
Corrected Asphalt Binder Content: 5.25 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/12/2024 ✔
