Summary for Test 2024-02-05-12-1
Test performed: AASHTO T30-19Project Information
Project Identifiers | Project ID: 66669 DEA: JMF-DATA EFIS: JMF-DATA |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for storing JMF sample data |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Sample Information
Sample Taken Date | 02/05/2024 | Sample Unique Key | 12 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/05/2024 |
Sample type | Quality Control | A brief description of the sample | 3/4" HMA-A w/ 25% RAP WM |
The quantity of what the sample constitutes | 100% | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Vuong | Last name of sampler or witnessed by | Dao |
Title of sampler | Not set | Telephone number of sampler | Not set |
Laboratory sample identification | Not set | Linked DIME Sample ID | Not set |
The fabricator/manufacturer/facility name | DeSilva Gates Aggregates-Sunol HMA | Transportation Laboratory (TL) Number | Not set |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | Not set | |
Structure name | Not set |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | DeSilva Gates Aggregates-Sunol |
---|---|---|---|
Aggregate Size | Not set | Aggregate Source | Not set |
RAP Stockpile | Not set | Stockpile Size (tons) | Not set |
Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2024-02-05-12
DIME Test ID: 2024-02-05-12-1
Testing Lab: CT D04 - Pleasanton Field Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2024-02-16
Test Results
Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: Gallagher and Burk Materials
Date of test: 02/05/2024
Cumulative percent passing the 2 in. sieve: no data
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 97 %
Cumulative percent passing the 3/8 in. sieve: 89 %
Cumulative percent passing the #4 sieve: 66 %
Cumulative percent passing the #8 sieve: 47 %
Cumulative percent passing the #16 sieve: 35 %
Cumulative percent passing the #30 sieve: 26 %
Cumulative percent passing the #50 sieve: 18 %
Cumulative percent passing the #100 sieve: 12 %
Cumulative percent passing the #200 sieve: 8.4 %
General comments (publicly viewable) (Max 1000 characters): Submitted from JMF - Vuong Dao
Test was verified on 2/16/2024 ✔