Summary for Test 2023-11-08-120-3
Test performed: AASHTO T269-14Project Information
| Project Identifiers | Project ID: 994803 DEA: 043J0704 EFIS: 0415000077 |
|---|---|
| DIST-CO-RTE-PM | 04-CC-80-10.1/13.5 |
| Award Date | 03/10/2023 |
| Closeout Date | 10/06/2025 |
| Work Description | Remove PCC and AC, place PCP and AC Resurfacing. |
| Location Description | Construction on State Highway in Contra Costa County in Hercules and Crockett from Route 80/4 separation to 0.1 mile west of Crockett Viaduct. |
| QA Service Level | 1 (Verified on 05/10/2023) |
Sample Information
| Sample Taken Date | 11/08/2023 | Sample Unique Key | 120 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 12/21/2023 | Sample type | Quality Assurance |
| A brief description of the sample | 1/2" HMA and Cores | The quantity of what the sample constitutes | 750 Tons |
| From where was the sample collected | Supplier | First name of sampler or witnessed by | Nick |
| Last name of sampler or witnessed by | Hall | Title of sampler | Lab Technician |
| Telephone number of sampler | 7072999133 | Laboratory sample identification | Rich_24_005 |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | County Asphalt Martinez | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | 3 |
| Sublot number | 1 | HMA Mix Number | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2023-11-08-120
DIME Test ID: 2023-11-08-120-3
Testing Lab: CT D04 - Concord Field Laboratory
Test Method: AASHTO T269-14: Standard Method of Test for Percent Air Voids in Compacted Dense and Open Asphalt Mixtures (Air Void)
Test Release Date: 2024-02-05
Test Results
Number of tests: 3
Is the sample lab compacted or field compacted?:
Input Type: Calculated
Tester's full name: Nicholas Hall
Date of test: 01/10/2024
| 1 | 2 | 3 | |
|---|---|---|---|
94.7 % | 95.3 % | 93.9 % | |
94.6 % |
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/5/2024 ✔
