Summary for Test 2024-01-29-18-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 215620 DEA: 01436404 EFIS: 0100000193 |
|---|---|
| DIST-CO-RTE-PM | 01-DN-101-35.8/36.5 |
| Award Date | 07/11/2022 |
| Closeout Date | Not set |
| Work Description | Dr. Fine Bridge Replacement |
| Location Description | DR. FINE BRIDGE REPLACEMENT FROM LAKE EARL DR TO S FRED D. HAIGHT DR ON HWY 101 ACROSS SMITH RIVER. |
| QA Service Level | 1 (Verified on 03/26/2021) |
Sample Information
| Sample Taken Date | 01/29/2024 | Sample Unique Key | 18 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 01/31/2024 |
| Sample type | Quality Assurance | A brief description of the sample | half inch HMA Type A |
| The quantity of what the sample constitutes | 12boxes | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | jason | Last name of sampler or witnessed by | huett |
| Title of sampler | TET | Telephone number of sampler | 7078155590 |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | tidewater | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Dr. Fine detour bridge | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | |
| Sublot number | HMA Mix Number | ||
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2024-01-29-18
DIME Test ID: 2024-01-29-18-1
Testing Lab: CT D01 - District 1 Materials Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-02-02
Test Results
What temperature unit is used?: Celsius
Input Type: Calculated
Tester's full name: Jayce Brown
Date of test: 02/01/2024
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 1720.8 g
Mass Loss: 93.6 g
Correction Factor (Percent by mass of HMA Specimen): 0.52 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 4.95 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 2/2/2024 ✔
