Summary for Test 2024-01-16-46-2

Test performed: CTM 217-June 2011

Project Information

Project IdentifiersProject ID: 215677
DEA: 044G0804
EFIS: 0412000332
COOP: 042676
DIST-CO-RTE-PM04-SOL-80-R10.4/30.2
Award Date01/18/2022
Closeout DateNot set
Work DescriptionHighway widening, overhead signs, and electronic toll system.
Location DescriptionIn Solano County in Fairfield and Vacaville from 1.0 mile west of Red Top Road Undercrossing to 0.4 mile east of Leisure Town Road Overcrossing.
QA Service Level1 (Verified on 04/11/2022)

Sample Information

Sample Taken Date01/16/2024 Sample Unique Key46
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/16/2024
Sample typeQuality Assurance A brief description of the sample3/8 x No. 8 PCC
The quantity of what the sample constitutesSample 1 of the day From where was the sample collectedSource
First name of sampler or witnessed byNick Last name of sampler or witnessed byHall
Title of sampler Telephone number of sampler7072999133
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCentral Dixon Plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)NONE
The fabricator's/manufacturer's product name for the samplePCC Aggregate + SAND The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedSample pick-up @ Plant
Where the material sample would have been placed if not sampledyes Primary Aggregate Nominal Size3/8 inch
The concrete mix design numberCT072CR8D Lot number
Sublot number Aggregate Mix NumberCT072CR8D

Test Details

DIME Sample ID: 2024-01-16-46
DIME Test ID: 2024-01-16-46-2
Testing Lab: CT D04 - Richmond Field Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2024-01-30

Test Results


Number of tests: 1
Input Type: Calculated
Tester's full name: IGNACIO ARECHIGA
Date of test: 01/16/2024
Temperature correction: 0
Temperature of solution: 72.5
Clay reading (test 1): 4.8
Sand reading (test 1): 4
Sand equivalent (test 1): 84
Sand equivalent before temperature correction: 84
Sand equivalent after temperature correction: 84
General comments (publicly viewable) (Max 1000 characters): Central Dixon Plant

Test was verified on 1/30/2024