Summary for Test 2023-08-09-97-1
Test performed: AASHTO T27-14Project Information
| Project Identifiers | Project ID: 215157 DEA: 021H5704 EFIS: 0216000036 |
|---|---|
| DIST-CO-RTE-PM | 02-SHA-299-67.8/77.8 |
| Award Date | 02/09/2023 |
| Closeout Date | 06/11/2024 |
| Work Description | BURNEY CAPM - PAVEMENT REHABILITATION |
| Location Description | BUNCH GRASS LOOKOUT RD TO NAPA LN |
| QA Service Level | 1 (Verified on 09/03/2020) |
Sample Information
| Sample Taken Date | 08/09/2023 | Sample Unique Key | 97 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/09/2023 |
| Sample type | Production Start-Up | A brief description of the sample | 1 bag of Lime Treated 3/4-inch Combined Virgin Aggregate |
| The quantity of what the sample constitutes | Production Start-Up Evaluation | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Randy | Last name of sampler or witnessed by | CGI |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | D79314A | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | J.F. Shea Construction — Fawndale Rock and Asphalt (Redding, CA) | Transportation Laboratory (TL) Number | 823602 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 95-45-0017::Fawndale Rock Quarry (Redding, CA) |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Cold Feed | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-08-09-97
DIME Test ID: 2023-08-09-97-1
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T27-14: Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates (Sieve Analysis)
Test Release Date: 2024-01-23
Test Results
What type of gradation is being tested?: HMA Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Does this test use 1/4 sieve? (question for HMA Gradation Type): No
Has the fine aggregate sample been reduced?: Yes
Input Type: Measured
Tester's full name: Josh Ferency
Date of test: 08/11/2023
| Cumulative Mass Retained | Cumulative Percent Passing | |||||
|---|---|---|---|---|---|---|
| 5035.2 grams | ||||||
| grams | % | |||||
| 0.0 grams | 100 % | |||||
| 0.0 grams | 100 % | |||||
| 70.0 grams | 99 % | |||||
| 1115.0 grams | 78 % | |||||
| 1693.0 grams | 66 % | |||||
| 2754.0 grams | 45 % | |||||
| 522.1 grams | ||||||
| 232.1 grams | 25 % | |||||
| 356.9 grams | 14 % | |||||
| 416.5 grams | 9 % | |||||
| 450.0 grams | 6 % | |||||
| 470.1 grams | 4 % | |||||
| 481.8 grams | 3.5 % | |||||
| 485.6 grams | ||||||
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/23/2024 ✔