Summary for Test 2024-01-19-16-1

Test performed: CTM 216-June 2011

Project Information

Project IdentifiersProject ID: 993526
DEA: 07301704
EFIS: 0714000033
DIST-CO-RTE-PM07-LA-210,605-R33.6/R36.5,25.7/26.0
Award Date03/22/2022
Closeout Date05/29/2026
Work DescriptionSLOPE PAVING, PLANT ESTABLISHMENT AND MODIFYING IRRIGATION SYSTEM.
Location DescriptionLOS ANGELES COUNTY IN MONROVIA, DUARTE AND IRWINDALE AT VARIOUS LOCATIONS ON ROUTE 210 FROM 0.1 MILE WEST OF SOUTH MAGNOLIA AVENUE UNDERCROSSING TO 0.1 MILE EAST OF ROUTE 210/605 SEPARATION AND ON ROUTE 605 FROM 0.1 MILE SOUTH TO 0.2 MILE NORTH OF ROUTE 2
QA Service Level1 (Verified on 04/19/2022)

Sample Information

Sample Taken Date01/19/2024 Sample Unique Key16
Date that the sample was received by the laboratory/organization performing the testing01/19/2024 Sample typeDepartment Acceptance
A brief description of the samplecoarse aggregate The quantity of what the sample constitutes1404 sqft
From where was the sample collectedJob Site First name of sampler or witnessed byChad
Last name of sampler or witnessed byChotibhongs Title of samplerMREA
Telephone number of sampler2134076963 Laboratory sample identification24-0205
Linked DIME Sample ID The fabricator/manufacturer/facility nameVulcan - Sun Valley
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)NA
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedCTM 231 Test Holes
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/8 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2024-01-19-16
DIME Test ID: 2024-01-19-16-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2024-01-19

Test Results


Is oversize material: No
Input Type: Measured
Tester's full name: Chad Chotibhongs
Date of test: 01/19/2024
In-place wet density: 1.83
Highest adjust wet density: 2.01
% Moisture: 12.9 %
Optimum Moisture: 12.9 %
Relative compaction: 91
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/19/2024 ✔