Summary for Test 2023-11-08-101-8
Test performed: AASHTO T315-20Project Information
Project Identifiers | Project ID: 214135 DEA: 09213404 EFIS: 0900000030 |
---|---|
DIST-CO-RTE-PM | 09-INY-395-29.9/41.8 |
Award Date | 10/22/2021 |
Closeout Date | Not set |
Work Description | ROADWAY EXCAVATION, PLACE HMA (TYPE A), AND ALTERNATIVE PIPE CULVERT. |
Location Description | INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE |
QA Service Level | 1 (Verified on 05/03/2019) |
Sample Information
Sample Taken Date | 11/08/2023 | Sample Unique Key | 101 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/18/2023 |
Sample type | Verification | A brief description of the sample | Asphalt Binder Sample |
The quantity of what the sample constitutes | 1 Can | From where was the sample collected | Source |
First name of sampler or witnessed by | Jared | Last name of sampler or witnessed by | kuplian |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Tank at Plant | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 70-10 |
---|---|---|---|
Modified | Lot number | ||
Sublot number | Tank number | ||
Time of sample | HMA Supplier | ||
Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
Multigrade Type | Asphalt Binder Mix Number |
Test Details
DIME Sample ID: 2023-11-08-101
DIME Test ID: 2023-11-08-101-8
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T315-20: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Test Release Date: 2024-01-18
Test Results
Phase: PAV residue
Input Type: Calculated
Tester's full name: Sm Ali
Date of test: 01/16/2024
Test Plate Diameter: 8 mm
Phase Angle (δ) (for the 10 cycles): 64.7 degree
(G*) x sin(δ)=: 4170 kPa
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/18/2024 ✔