Summary for Test 2023-11-11-20-2
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 993333 DEA: 04264724 EFIS: 0419000068 |
---|---|
DIST-CO-RTE-PM | 04-MRN-101-R20.8/27.1 |
Award Date | 04/26/2022 |
Closeout Date | Not set |
Work Description | CIP BRIDGES, CONSTRUCT ROADWAY, RETAINING WALLS AND MODIFY ELECTRICAL. |
Location Description | MARIN COUNTY IN AND NEAR NOVATO FROM 0.1 MILE SOUTH OF FRANKLIN AVENUE OVERHEAD TO 0.5 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE |
QA Service Level | 1 (Verified on 11/01/2021) |
Sample Information
Sample Taken Date | 11/11/2023 | Sample Unique Key | 20 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/11/2023 |
Sample type | Quality Control | A brief description of the sample | aggregate |
The quantity of what the sample constitutes | 27 CY | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Roland | Last name of sampler or witnessed by | Ocansey |
Title of sampler | lab Technician | Telephone number of sampler | |
Laboratory sample identification | L233358 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Shamrock Materials Petaluma | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0042 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Supplier | |
Where the material sample would have been placed if not sampled | concrete | Primary Aggregate Nominal Size | 1 inch |
The concrete mix design number | H7511503 | Lot number | |
Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-11-11-20
DIME Test ID: 2023-11-11-20-2
Testing Lab: Pavement Engineers
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2024-01-10
Test Results
What size aggregate is being tested?: 1 in. x No. 4 - Coarse Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Roland Ocansey
Date of test: 11/13/2023
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 87 %
Cumulative percent passing the 1/2 in. sieve: 53 %
Cumulative percent passing the 3/8 in. sieve: 39 %
Cumulative percent passing the #4 sieve: 10 %
Cumulative percent passing the #8 sieve: 3 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/10/2024 ✔