Summary for Test 2023-11-03-63-1
Test performed: CTM 521-June 2020Project Information
Project Identifiers | Project ID: 214135 DEA: 09213404 EFIS: 0900000030 |
---|---|
DIST-CO-RTE-PM | 09-INY-395-29.9/41.8 |
Award Date | 10/22/2021 |
Closeout Date | Not set |
Work Description | ROADWAY EXCAVATION, PLACE HMA (TYPE A), AND ALTERNATIVE PIPE CULVERT. |
Location Description | INYO COUNTY NEAR OLANCHA AND CARTAGO FROM 1.4 MILES SOUTH OF LOS ANGELES AQUEDUCT BRIDGE TO 0.2 MILE SOUTH OF ASH CREEK BRIDGE |
QA Service Level | 1 (Verified on 05/03/2019) |
Sample Information
Sample Taken Date | 11/03/2023 | Sample Unique Key | 63 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/04/2023 |
Sample type | Quality Control | A brief description of the sample | structural concrete |
The quantity of what the sample constitutes | 2 cylinders | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Sebastian | Last name of sampler or witnessed by | Adams |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | 7-11 materials ridgecrest | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 718216A |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 856580 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Headwall footings SB 1621 | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-11-03-63
DIME Test ID: 2023-11-03-63-1
Testing Lab: Sequoia Consultants
Test Method: CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders
Test Release Date: 2024-01-05
Test Results
Unit system used?: US Units
Number of specimens: 2
Test performed: With no density determined
Input Type: Calculated
Tester's full name: Gavin Hernandez
Date of test: 12/01/2023
Capped in accordance with?: ASTM C617 - Sulfur Mortar Cap
Average diameter of cylinder 1: 6.01 in
Average diameter of cylinder 2: 6.01 in
Maximum load on cylinder 1: 125920 lb
Maximum load on cylinder 2: 132190 lb
Type of fracture pattern of cylinder 1: 2
Type of fracture pattern of cylinder 2: 2
Comment on any defect in either specimen or caps (Max 250 Characters): no data
Correction factor for cylinder 1: 1
Correction factor for cylinder 2: 1
Age of specimen: 28 days
Age of specimen in hours: 0 hours
Cross sectional area of cylinder 1: 28.37 in^2
Cross sectional area of cylinder 2: 28.37 in^2
Compressive strength (to nearest 10 psi): 4550 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/5/2024 ✔