Summary for Test 2023-12-18-47-5
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 214649 DEA: 07316004 EFIS: 0715000194 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-14-60.70 |
| Award Date | 02/07/2023 |
| Closeout Date | Not set |
| Work Description | REHABILITATION FOR THE ON/OFF RAMPS AND ADJACENT SHOULDERS. UPGRADING METAL BEAM GUARDRAILS, AC DIKES, SIGN PANELS, CURB RAMPS, TRAFFIC LOOPS DETECTORS, AND SOME OTHER HIGHWAY APPURTENANCES. |
| Location Description | ROUTE 14 FROM PALMDALE BLVD TO KERN COUNTRY LINE. |
| QA Service Level | 1 (Verified on 01/29/2020) |
Sample Information
| Sample Taken Date | 12/18/2023 | Sample Unique Key | 47 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/21/2023 |
| Sample type | Department Acceptance | A brief description of the sample | 1x4 PCC Aggregates |
| The quantity of what the sample constitutes | 470 cy | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | victor | Last name of sampler or witnessed by | Pham |
| Title of sampler | Telephone number of sampler | 2137924794 | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Atkinson - Lancaster | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-19-0026 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | JPCP | The fabricator/manufacturer designation for the sample | mix SCI-12622-1 |
| The plant number | Atkinson Portable Jobsite | A detailed description of where the material sample was collected | Conveyor Belt |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
| The concrete mix design number | SCI-12622-1 | Lot number | |
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2023-12-18-47
DIME Test ID: 2023-12-18-47-5
Testing Lab: CT D07 - Plant Services
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2024-01-13
Test Results
Number of tests: 2
Input Type: Measured
Tester's full name: Victor Pham
Date of test: 12/21/2023
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 5
Sand reading (test 1): 3.8
Clay reading (test 2): 4.9
Sand reading (test 2): 3.7
Sand equivalent (test 1): 76
Sand equivalent (test 2): 76
Sand equivalent before temperature correction: 76
Sand equivalent after temperature correction: 76
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/13/2024 ✔