Summary for Test 2023-12-23-1-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 213457 DEA: 11430434 EFIS: 1118000197 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-8-12.9/14.6,14.9 |
| Award Date | 07/16/2022 |
| Closeout Date | 08/21/2025 |
| Work Description | HMA, STRUCTURAL BRIDGE, POLYESTER CONC OVERLAY, JPCP, & CONC BARRIER. |
| Location Description | SAN DIEGO COUNTY IN LA MESA AND EL CAJON FROM 0.1 MILE WEST OF GROSSMONT BOULEVARD OVERCROSSING TO WEST MAIN STREET OVERCROSSING AND AT MARSHALL AVENUE OVERHEAD |
| QA Service Level | 1 (Verified on 06/22/2018) |
Sample Information
| Sample Taken Date | 12/23/2023 | Sample Unique Key | 1 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 12/26/2023 | Sample type | Quality Assurance |
| A brief description of the sample | 3/4" HMA PSU | The quantity of what the sample constitutes | 12 boxes 6 bags |
| From where was the sample collected | Source | First name of sampler or witnessed by | Ben |
| Last name of sampler or witnessed by | Smith | Title of sampler | TET |
| Telephone number of sampler | Laboratory sample identification | 7814-PSU | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vulcan Otay | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | 220818 Otay Val | |
| Binder content (%) | Not set | Virgin binder PG | Not set |
| Design binder PG | Not set | Binder Supplier | Not set |
| RAP content (%) | Not set | WMA Additives | Not set |
| Antistrip type | Not set |
Test Details
DIME Sample ID: 2023-12-23-1
DIME Test ID: 2023-12-23-1-1
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2024-01-05
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Daniel Smith / J Seymour
Date of test: 12/29/2023
Test procedure used?: Method A
Mass of the specimen basket assembly: 3935.7 g
Mass of the specimen and specimen basket assembly prior to ignition: 5976.1 g
Mass of HMA Sample prior to ignition: 2040.4 g
Mass Loss: 113.1 g
Mass of aggregate remaining after ignition: 1927.3 g
Correction Factor (Percent by mass of HMA Specimen): 0.68 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.00 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 4.86 %
General comments (publicly viewable) (Max 1000 characters): Target 4.7% / .3 to +.5
Test was verified on 1/5/2024 ✔
