Summary for Test 2023-12-21-5-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 994144 DEA: 060W15V4 EFIS: 0619000107 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-58,204-R53.4/R54.5,R0.0/4.6 |
| Award Date | 10/06/2022 |
| Closeout Date | 05/09/2025 |
| Work Description | MODIFY SIGNAL AND LIGHTING SYSTEMS AND REPLACE CURB RAMPS. |
| Location Description | KERN COUNTY IN BAKERSFIELD ON ROUTE 58 FROM SOUTH H STREET OVERCROSSING TO ROUTE 204 AND ON ROUTE 204 FROM ROUTE 58/204 SEPARATION TO L STREET |
| QA Service Level | 1 (Verified on 07/28/2022) |
Sample Information
| Sample Taken Date | 12/21/2023 | Sample Unique Key | 5 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 12/21/2023 | Sample type | Department Acceptance |
| A brief description of the sample | Native Material | The quantity of what the sample constitutes | 40 lbs native material |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | James |
| Last name of sampler or witnessed by | Watson | Title of sampler | Materials Tester |
| Telephone number of sampler | 6617176041 | Laboratory sample identification | 186 |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | none | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Test holes at jobsite | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2023-12-21-5
DIME Test ID: 2023-12-21-5-1
Testing Lab: CT D06 - Bakersfield Field Laboratory
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2023-12-21
Test Results
Method Type:: Standard Count
Number of Tests:: 3
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: James Watson
Date of test: 12/21/2023
Gage No.: 30681
Test No.: 186
Nuclear By: james watson
Non-Bias Plan No.: 1 even
Depth: 8
Material No.: no data
Material Type: silty sand mod, BRN and F-gravel
Impact By: james watson
Standard Count Density: 1587 g/cc
Count or Density 1: 745 g/cc
Count or Density 2: 795 g/cc
Count or Density 3: 756 g/cc
Standard Count Moisture: 617 g/cc
Moisture Count 1: 136 g/cc
Moisture Count 2: 130 g/cc
Moisture Count 3: 152 g/cc
Sum of Count or Density: 2296 g/cc
Average of Count or Density: 765 g/cc
Sum of Moisture Count: 418 g/cc
Average of Moisture Count: 139 g/cc
Count Ratio Density: 0.48
Count Ratio Moisture: 0.23
Calculated Percent Relative Compaction: 96.5 %
Reported Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters): Ramp Area#78 curb and gutter@ H st and Hwy 58 off ramp PM 53.39 elevation: FSG length: 27ft width: 2.5 ft Retest # 1
Test File Attachments
| File Name | Extension | File Size | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|---|
| 06-90W15V4_251221_186 | 109.43 KB | 12/21/2023 | 2023-12-21-5-1 | Info |
Test was verified on 12/21/2023 ✔
