Summary for Test 2023-10-19-71-3
Test performed: CTM 557-June 2020Project Information
| Project Identifiers | Project ID: 993141 DEA: 060V1204 EFIS: 0616000207 |
|---|---|
| DIST-CO-RTE-PM | 06-MAD-99-R6.9/R7.6 |
| Award Date | 06/22/2022 |
| Closeout Date | 12/02/2025 |
| Work Description | Cottonwood Creek Bridge Replacement - REPLACE BRIDGES AND CONSTRUCT RETAINING WALLS. |
| Location Description | MADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING |
| QA Service Level | 1 (Verified on 07/28/2021) |
Sample Information
| Sample Taken Date | 10/19/2023 | Sample Unique Key | 71 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/20/2023 |
| Sample type | Quality Assurance | A brief description of the sample | 4x8 concrete cylinders |
| The quantity of what the sample constitutes | 7 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Allante | Last name of sampler or witnessed by | Blocker |
| Title of sampler | QC Field Technician | Telephone number of sampler | |
| Laboratory sample identification | Mix ND20507 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Builders Concrete Sanger | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | ND20507 |
|---|---|---|---|
| The truck number from where the sample was collected | Load 31 | The batch plant ticket number from where the sample was collected | 0 |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | Set 3 | |
| A detailed description of where the material sample was collected | Bridge Deck | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2023-10-19-71
DIME Test ID: 2023-10-19-71-3
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2023-12-07
Test Results
Input Type: Calculated
Tester's full name: Allante Blocker
Date of test: 10/19/2023
Temperature: 77 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 12/7/2023 ✔