Summary for Test 2023-10-19-69-5

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 993141
DEA: 060V1204
EFIS: 0616000207
DIST-CO-RTE-PM06-MAD-99-R6.9/R7.6
Award Date06/22/2022
Closeout DateNot set
Work DescriptionCottonwood Creek Bridge Replacement - REPLACE BRIDGES AND CONSTRUCT RETAINING WALLS.
Location DescriptionMADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING
QA Service Level1 (Verified on 07/28/2021)

Sample Information

Sample Taken Date10/19/2023 Sample Unique Key69
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/20/2023
Sample typeQuality Assurance A brief description of the sample4x8 concrete cylinders
The quantity of what the sample constitutes7 From where was the sample collectedJob Site
First name of sampler or witnessed byAllante Last name of sampler or witnessed byBlocker
Title of samplerQC Field Technician Telephone number of sampler
Laboratory sample identificationMix ND20507 Linked DIME Sample ID
The fabricator/manufacturer/facility nameBuilders Concrete Sanger Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberND20507
The truck number from where the sample was collectedLoad 6 The batch plant ticket number from where the sample was collected0
Concrete batch plant The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedBridge Deck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2023-10-19-69
DIME Test ID: 2023-10-19-69-5
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2023-12-07

Test Results


Input Type: Calculated
Tester's full name: Allante Blocker
Date of test: 10/19/2023
Air Content: 2 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 12/7/2023